|
| Ansal Megapolis Flats |
Megapolis is very well connected with Delhi and other vital commercial centres through expressways and highways, ie Gautam Budh Expressway to Greater Noida, Eastern peripheral expressway, NH-91. The Poject lies within the National Capital Region (NCR). The mega city lies to the proposed International Airport and is adjoining north India's largest proposed rail terminal coming up in Bodaki on the Delhi Howrah railway list. |
|
|
|
| |
|
| Megapolis will be India's first self-contained academic township. A first of its kind initiative, that will cater to the multifarious needs of the students in close accordance to the industry needs. This academic township will be founded on a culture of innovative thinking, modem application of technology in traditional systems of education and a pioneering zeal in fashioning students for an increasingly competitive world of the future. This dedicated education zone, will house a number of leading universities and educational institutes of world standards.
Having recently tied-up with Educomp Solutions Ltd., which runs the Millennium School, the township will leverage it to offer a unique blend of best of global education practices and inherent strengths of Indian education system to unleash the natural potential and talent of each child, nurture lifelong learners who would be leaders of tomorrow. |
|

Approved by the UP Government under hi tech township development policy.
Detailed Layout Plan and Detail Project Report approved by Competent authorities and Development Agreements signed.
2504 acres Hi-Tech township extendable upto 9000 acres to be developed as a world class residential and
|
|
|

| Essentials |
Security |
Community |
Recreational |
- Regular Water Supply
- Dependable Power Supply
|
- Earthquake Resistant Structure
- 24 Hours Manned Security
- Fire Fighting Systems
- Gated Complex.
|
- Community Hall for social gatherings
|
- Children's Play Area
- Badminton Court
- Tennis Court
- Central Lawns
- Green Landscaped Area
|
|
| |
| Structure |
Framed structure confirming to BIS seismic codes with brick masonry filler walls. |
| Floor Finishes |
Living/Dinning
Bedrooms
Stairs
Balconies |
Vitrified Tiles
Ceramic Tiles
Stone flooring on treads
Non-Skid Ceramic Tiles |
| Doors |
Machine made Molded Door shutter with AI fitting |
| Windows |
UPVC / Aluminum anodized with Float glass. |
| Toilets |
Floor
Walls
Chinaware
Counters
Other Fixtures |
Non-Skid Ceramic Tiles/Porcelain Tiles.
Tiles upto 4' and OBD above
European type WC, wash hand basin, CP Fittings, single lever CP fittings.
Marble Counter
Looking, mirror, towel ring /rod, paper holder, soap dish and health faucet. |
| Kitchen |
Walls
Floor
Counter
Fitting
Sink
Water Supply |
Ceramic tile cladding on walls 2 feet above the counter OBD for balance area.
Ceramic Tiles
Marble
Single lever CP fittings with Mixers
Stainless Sink with drain board
Provision for hot and cold water supply. |
| Finishes |
Internal
External |
Drawing and Dining rooms/bedrooms walls shall be finished with OBD paint as per design
Pleasing elevation with semi-permanent finish / all weather exterior paint |
| Electrical Work |
Copper wires in concealed PVC conduits with modular switches
Provision shall be made for sufficient light & power points. |
| Telecommunications |
Switches & Sockets |
Telephone & TV points in all Bedroom, Drawing / Dining Room |
|
|
| Type |
Size (sq.ft/sq.yd) |
Price* INR (sq.ft/sq.yd) |
Total * INR Price |
Download |
| 1BHK |
713 |
1725 |
1229925 |
View
|
| 2 BHK |
1021 |
1725 |
1760966 |
View
|
| 2 BHK |
1010 |
1725 |
1741284 |
View
|
| 3 BHK |
1460 |
1725 |
2516879 |
View
|
| 4 BHK |
2408 |
1725 |
4154007 |
View
|
| Studio Appts |
522 |
1725 |
909817 |
View
|
|
|
| 2012 |
| |
A) Down Payment Plan (With 15% Rebate)
| S.No. |
Schedule of Payment |
% age of Basic Price + PLC |
Other Charges |
| 1 |
At the time of Booking |
5% |
|
| 2 |
Within 60 days from the date of booking (Less Down Payment Discount of 15%) |
90% |
+ 100% of Car Parking |
| 3 |
At the time of Possession |
5% |
Maintenance Security Deposit + Stamp Duty + Registration Exp + Other Charges as applicable |
| |
Total |
100% |
|
B) Interest Free Installment Plan
| S.No. |
Schedule of Payment |
% age of Basic Price + PLC |
Other Charges |
| 1 |
At the time of Booking |
5% |
|
| 2 |
Within 60 days of booking |
5% |
|
| 3 |
Within 105 days of booking |
5% |
|
| 4 |
Within 150 days of booking |
5% |
|
| 5 |
Within 195days of booking |
5% |
|
| 6 |
On start of Excavation |
5% |
+ 25% of Car Parking |
| 7 |
On Casting of Ground Floor Roof |
5% |
+ 25% of Car Parking |
| 8 |
On Casting of First Floor Roof |
5% |
+ 25% of Car Parking |
| 9 |
On Casting of Third Floor Roof |
5% |
+ 25% of Car Parking |
| 10 |
On Casting of Fifth Floor Roof |
5% |
|
| 11 |
On Casting of Seventh Floor Roof |
5% |
|
| 12 |
On Casting of Ninth Floor Roof |
7.5% |
|
| 13 |
On Casting of Eleventh Floor Roof |
7.5% |
|
| 14 |
On Completion of Super Structure Frame Work |
5% |
|
| 15 |
On Completion of Massionery Work within the Apartment |
5% |
|
| 16 |
On Completion of Internal Plaster within the Apartment |
5% |
|
| 17 |
On Completion of Flooring within the Apartment |
5% |
|
| 18 |
On Fixing of windows & door shutters within the Apartment |
5% |
|
| 19 |
At the time of offer of Possession |
5% |
Maintenance Security Deposit + Stamp Duty + Registration Exp + Other Charges as applicable |
| |
Total |
100% |
|
Allied Charges
One Open Parking slot of Rs. 75000/- mandatory for all types of units upto 3Bed Room Unit and Two for 4Bed Room Unit Units |
|
| |
|
| ANSAL |
| |
| |